Business Days

Count Monday-to-Friday days between two dates. Public holidays stay in the count.

Use this tool

Result

The result appears in this panel after you run the tool.

About this tool

Each date from the start through the end is kept when it falls on Monday, Tuesday, Wednesday, Thursday, or Friday. A holiday that falls on a weekday is still counted, because this page has no list of holidays.

Use Date Difference when you want every calendar day, including weekends.

How to use it

  1. Enter the start date and the end date.
  2. Count business days.
  3. Read the number of Mondays through Fridays in that span.

Limitations

The first date is outside the tally

Walk forward, skip Saturday and Sunday

The page steps from the start date toward the end date, one civil day at a time, using UTC dates. The start date itself is never inspected. Each later date, including the end date, adds one when its UTC weekday is Monday through Friday, and adds nothing when that weekday is Saturday or Sunday. Sunday is weekday number 0 and Saturday is 6 in that numbering. A Friday start and a Monday end therefore contribute 1, the Monday. A Monday start and a Friday end contribute 4: Tuesday, Wednesday, Thursday, and Friday. When start and end name one calendar day, the walk length is zero and the tally stays at 0.

If the end sits before the start, the step runs backward and the tally is negative. A weekday crossed in reverse subtracts one. Weekends still add nothing. The sign tells you the direction. It is not an error.

What “inclusive” would have changed

A contract that says both the start date and the end date count, when both are weekdays, wants one more than this page shows. Monday through Friday inclusive of both ends is five weekdays. This page shows four. Add the start date yourself when it is a weekday and you truly need a closed interval. Do not add it when the start is a weekend, because the page already omitted it for the right reason, and adding one would invent a business day.

Public holidays are not removed. The result text says the count is Monday to Friday and that holidays are not included, meaning a holiday that falls on Wednesday is still counted. There is no holiday list to edit, and there is no country selector. Christmas on a Tuesday stays in the tally. If your office closes that day, subtract it after you read the number. The date difference page is the one that also keeps Saturday and Sunday. Use that when the question is calendar span. Use this page when the question is weekday steps after the start, with the end included and holidays still present.

Privacy

Your input is processed in your browser and is not uploaded to UtilChain. File names, text, and results are not sent to analytics.