Weekday Calculator
Enter a date and read the weekday.
About this tool
The date is read as a UTC calendar date in YYYY-MM-DD.
Time of day is not part of this result.
How to use it
- Open this page and provide the input it asks for.
- Set the options that are visible, then use Find weekday.
- Read the result in the panel. Copy it or download it when a file is offered. The input stays in this browser.
Limitations
- Time of day is not part of this result.
English name of the UTC date
The date is checked, then named
The field must be four digits, a hyphen, two digits, a hyphen, and two digits. That calendar date is built at UTC midnight. If the year, month, or day changes during that construction, the date is rejected with the message that it is not on the calendar. A common year cannot contain 29 February, so that entry fails. 31 April fails too. The page will not roll either one forward and then name the following day. A successful date is formatted back to the same ISO text, so you can see that the day you typed survived.
The weekday is the long English name from a fixed en-GB formatter locked to UTC. Monday stays Monday even when the browser language is not English. The name is the weekday of that UTC civil date. There is no time field and no zone field. A phone that shows Sunday evening while UTC has already reached Monday is not consulted. If you have a millisecond instant and you care which zone’s weekday you mean, convert the instant in that zone first and only then paste the civil date.
What the two lines are for
The first line is the name. The second line is the ISO date again. Nothing here returns a week number, an ordinal day, or a count of days until the weekend. Those are other pages. This one answers a single question: which weekday name belongs to this civil date under UTC.
Leap day does not get a special name. 29 February 2024 is a Thursday because that UTC date is a Thursday, not because of any leap-day tradition. 1 March 2024 is the next name in sequence. The Gregorian length of February affects whether 29 February can be typed at all. It does not affect the naming rule once the date has been accepted. Use a leap-year check when you only have a year. Use this page when you have a full date and you want the name.
Privacy
Your input is processed in your browser and is not uploaded to UtilChain. File names, text, and results are not sent to analytics.

